A. Transportation
Check all parts from damage during transport.
B. Installation assembly
The blowers are to be installed weather protected and are not to be stored outdoors unprotected. When the blowers are installed outdoors they must be covered. Install ring blower horizontally or vertically. Do not subject blowers to vibrations or shocks. Blower with base should be secured tightly at the site of operation on solid, even ground. The Ring Compressors can be installed in any direction, but when mounted vertically, the motor side should be upward.
C. Electrical connection
Note! Work described here must be executed by a qualified electrician only. Connect the motor in accordance with the wiring diagram to be found in the terminal box. The blower has a single or three-phase motor as described on the motor plate. The motor should be protected with an overload switch.
D. Control of rotation direction
Startup the blower for a short moment, Check the rotation direction. The rotation direction on the impeller must be in accordance with the arrows on the motor. If incorrect rotation is experienced, then check the wiring circuit in the terminal box.
Copyright © 2020 Greentech International (Zhangqiu) Co., Ltd. | All Rights Reserved 鲁ICP备12007127号 Technical support:Xintuweb